PROJECTSSaudi Arabia
Hospitals

Dhahran Ophthalmology Center

A brief overview of the project to establish an ophthalmology center in Dhahran: Kholoud Contracting Company established an ophthalmology center in Dhahran

Client
Ministry of Health
Status
completed
Location
Saudi Arabia
Project Brief

A brief overview of the project to establish an ophthalmology center in Dhahran: Kholoud Contracting Company established an ophthalmology center in Dhahran for the Ministry of Health at a total value of 54,074,004 Saudi riyals. The project includes the construction of medical center buildings on a total area of ​​18,000 square meters. Construction works include the following: Excavation, backfilling and site preparation work Construction of concrete structures for buildings Masonry, brick and tile work Installation of doors and windows Electrical and sanitary installation works Air conditioning and ventilation works Interior and exterior finishes Road works, walkways and external tiles This ambitious project was implemented within the specified timetable and with the required technical specifications to ensure the provision of an integrated and advanced medical facility to serve the people of Dhahran and the surrounding areas. Based on the nature and size of the project, here is an approximate timetable for the implementation phases of the Dhahran Ophthalmology Center construction project: Phase 1: Preliminary works (3 months) Surveying and planning work Excavation, backfilling and site preparation Infrastructure works (utility networks) Phase Two: Construction Works (12 months) Concrete works (foundations and structures) Masonry works (brick and tile) Carpentry works (doors and windows) Electrical and sanitary installation works Air conditioning and ventilation works Phase Three: Finishing Works (6 months) Interior finishing works (paint, tiles, ceiling) External finishing works (facades and tiles) Road works and external corridors Phase Four: Equipment and Operation (3 months) Supply and installation of medical supplies and equipment Operations and tests Final delivery of the project Thus, the total duration of project implementation is approximately 24 months or two years.

Dhahran Ophthalmology Center
Dhahran Ophthalmology Center
kholood